- The Equipment on one of the intermediaries is missing a capacity
- find the equipment, set a capacity
- On each bom that uses that equipment, go it it, remove it and re-add the equipment to get a capacity.
- Sometimes the Bom is not certified properly
- Change the status to Under Development, Save
- Ensure the correct equipment is on the bom, with a capacity configured
- Change it back to Certified, Save
- The planned production order from quick planning does not have a default machine populated
- After running quick planner, Review all planned productions and enter an equipment code if it does not have one before beginning batch planning
Thursday, April 23, 2020
Columbus Foods - There is no batch planning - batch within the filter
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment