- Manufacturing Setups & Cards
- Items
- Item Engineering Data
- Locations
- Manufacturing Accounts
- Machines
- Labor Codes
- Manufacturing Bill of Materials
- Routings
- Manufacturing Costing Overview
- How does GP Manufacturing Calculate FG costs?
- Material Costs
- Raw materials
- WIP
- Scrap
- Backflushing
- Routing Costs
- Time
- Machine Cost
- Labor Cost
- Overhead Cost
- Production
- By Forecast
- How to drive production based on forecasted demand
- By Sales Order
- How to Manufacture-to-order
- Create a Back Order Type>Assign Invoice Type
- Create and Order type>Assign Back order type
- Sales>Setup>Sales Order Processing>Additional>Manufacturing Sales Order Prefs
- Enable silent MO Generation
- Item Card
- Enable Back Orders
- Item Engineering >Set to "Make to Order-Silent"
- Create Order for more stock than is available
- Enter Line
- Select Back Order Balance or all
- Once you tab off the line
- MO is automatically created
- SO/MO Link is automatically created
- OR Transfer Order to Back Order
- MO is automatically created
- SO/MO Link is automatically created
- Save Order
- Use Smartlist or SSRS to build report to determine which MO's to release
- Print Picking tickets from mo screen to give to production staff
- Complete production
- Receive MO (This allocates stock to the linked order)
- Transfer Order to Invoice
- This will allocate stock to the invoice
- Print invoice
- By Sales Order with Manual Allocation and Fulfilment
- Same as above, except with additional steps
- On Order Type, tick separate fulfilment process
- From Item Card>GoTo>Fulfilment Detail>Enable Maintain Shipping History
- From Sales Transaction Entry
- Allocate stock by going to Options>Allocate or Fulfill>Allocate
- Fulfil stock by going to Transactions>Sales>Order Fulfilment
- Enter Qty fulfilled
- By MRP
- How to let the system suggest Purchase orders and MO's to meet minimum requirements and other demand
- Manual
- Reporting
- Traveller Report
- Variance Report
Friday, May 13, 2016
Dynamics GP - Manufacturing Training Topics - MFG, MO, SO, BO
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment