- Supply Driven Planning
- Enter Location
- Enter demand days view to get all demand for the next x days
- Enter Quantity to process
- In Web client, the processing screen will get pushed off screen if you have more than 5 boms displayed
- Either filter the list, or use the full client
- Should always process a little more to ensure you cover all package orders completely
- Enter Quantity to package on each Packaging Option line>Enter
- Batch floor processing to execute each one
- Must output from int orders
- Output on final packaging orders
- Batch Reporting to apportion materials and costs across all production orders
- Post all production orders
Monday, April 27, 2020
Dynamics NAV/BC - Columbus Foods - Co-Product Planning and execution process
Dynamics NAV / BC - "the posting date is after the current fiscal year" posting period message
Saturday, April 25, 2020
NAV / BC - Calculate Intermediary and Finished Good Item costs using BOM information
- Use the standard Cost calculation tools to populate the cost in the standard cost field
- Use this for your initial cost estimates before production
- Run Standard Cost Worksheet
- Suggest Item Standard Costs
- Roll up standard costs
- Set costing method filter to blank or remove it
- Ensure all boms are either new or certified or you will get an error
- This will update the standard costs on the item card
- You do not have to run the "implement standard cost changes" if you're not actually using standard costing
Thursday, April 23, 2020
NAV / BC - Showmandatory options does not seem to work
- on numeric and option fields, the default is zero, and is never actually blank which causes the field to never show the red *
- Set the BlankNumbers to BlankZero, and BlankZero = Yes to actually let it treat zeroes as blanks .
Columbus Foods - There is no batch planning - batch within the filter
- The Equipment on one of the intermediaries is missing a capacity
- find the equipment, set a capacity
- On each bom that uses that equipment, go it it, remove it and re-add the equipment to get a capacity.
- Sometimes the Bom is not certified properly
- Change the status to Under Development, Save
- Ensure the correct equipment is on the bom, with a capacity configured
- Change it back to Certified, Save
- The planned production order from quick planning does not have a default machine populated
- After running quick planner, Review all planned productions and enter an equipment code if it does not have one before beginning batch planning
Wednesday, April 22, 2020
Columbus Foods ADC - Setup
- Setup
- ADC Setup>ADC>Transaction Setup
- Set Defaults on Transactions
- Web Client Setup
- http://fsbbonapps01/adc/login.html
- Click three lines in top left
- Enter all information
- Create a user that will be the system user
- Use the web access key on the user card
Tuesday, April 21, 2020
BC - "An Item with the same key has already been added" when trying to unpublish an extension
- Confirm no objects already exist with names trying to be used in extensions
- Run this to check if there are any duplicate object entries for specific companies. If any records return, check the names
- select * from Object where [Company Name] > ''
- Restart Instance
Monday, April 20, 2020
Columbus Foods - ADC Receiving - How to fix an accidental over-receive
- Over receiving in ADC will adjust the original PO
- Go to Order Receiving>Open receiving screen
- Find the errant line>Delete it from the warehouse receipt
- You may need to go to Actions>Functions>Containers
- Untick "Receive" to allow you to delete the line
- Select all containers and delete them if you plan on redoing the PO, as these containers are connected to that specific PO number
- Go to the Purchase Order>Set the quantity back to the correct quantity to receive
- Close your ADC browser, and reopen it to reset any data on the transaction
- Enter PO
- Enter Container
- Enter Item Number
- Enter Quantity
- After completing the receipt in ADC, the new line in the Order Receiving will not have a Bin
- From the Order Receiving screen, open the warehouse receipt
- Find the line, add the "RECEIVE" Bin
- You can now post your corrected receipt
Friday, April 17, 2020
Columbus Foods - Manual Production Process
- Warehouse Physical Journal
- Adjust out raw materials
- Adjust in finished goods
Columbus Foods - Execution Process
- After planning and creating all planned Production Orders
- Do thaw pre-process
- Run Production Replenishment / Move List
- Select a specific date
- Run for each replenishment area
- Print Report
- User Manually decides how much to actually move int the thaw bin
- on ADC mobile
- do container move if moving entire container
- do Bin to Bin for partial container or loose amounts
- Scan item case label with lot
- enter quantity
- Place
- new container, in Replenishment Area
- Place all - yes
- Next day, run the Production Replenishment / Move List
- If the report identifies a preprocess is required
- Complete Pre-Process activity
- Pre-Process Activities
- Open REL order (Planned order no. series)
- From Container no: Enter container in THAW
- Register Pre-Process Activity
- Consume Raw Materials-Production orders not connected to packaging orders
- Batch Floor Processing
- Select Production Order
- Click Process
- Enter posting date
- Click next
- Enter Qty to consume or Qty alt
- Next through each bom step
- Actions>New Lot
- Enter Qty to output
- click Actions>New Lot if you need a lot number
- Enter Qty Alt.
- Complete Production - Batch Reporting
- Select Production order
- System will auto-balance output from main order to use as consumption and input to packaging orders
- Quantity will auto-fill with expected quantity (auto backflush)
- Post> Finish
- If you choose "Leave order open" it will allow you to go back and make changes and post again
- RM is consumed, FG is produced, costs are finalized
- Consume Raw Materials-Batch Orders connected to packaging orders
- Batch Floor Processing-Main production order
- Select Main Production Order
- Click Process
- Enter posting date
- Click next
- Enter Qty to consume or Qty alt
- Next through each bom step
- Skip output (It will use output from the Packaging Orders)
- ADC Consumption
- Batch Floor Processing-Sub production orders (Packaging)
- Select Sub Production Order
- Click Process
- Enter posting date
- Click next
- Skip consumption (It will use consumption from Main order)
- Next through each bom step
- Actions>New container
- Enter container id
- If loose or intermediate, no container id is required
- Actions>New Lot
- Enter Qty to output
- click Actions>New Lot if you need a lot number
- Enter Qty Alt.
- Complete Production - Batch Reporting
- Select main batch order
- System will auto-balance output from main order to use as consumption and input to packaging orders
- Quantity will auto-fill with expected quantity (auto backflush)
- Post> Finish
- If you choose "Leave order open" it will allow you to go back and make changes and post again
- RM is consumed, FG is produced, costs are finalized
NAV BC Extensions - The Multi-part Identifier "xxxxxx.field" could not be bound. in BC on-premises when we search on list page which has a custom field.
- This is a bug in the web client that comes up when the search returns no results, and there is a custom field on the page
- Workarounds
- Add any filter manually first, then the search works
- Hide the custom field, then reload the page
Wednesday, April 15, 2020
Msg 7399, Level 16, State 1, Line 1 The OLE DB provider "Microsoft.ACE.OLEDB.12.0" for linked server "(null)" reported an error. The provider reported an unexpected catastrophic failure. Msg 7303, Level 16, State 1, Line 1 Cannot initialize the data source object of OLE DB provider "Microsoft.ACE.OLEDB.12.0" for linked server "(null)".
How to open Excel from SQL
- Install Access 2010 components
- Run these scripts
sp_configure 'Ad Hoc Distributed Queries', 1;
RECONFIGURE;
GO
EXEC master.dbo.sp_MSset_oledb_prop N'Microsoft.ACE.OLEDB.15.0', N'AllowInProcess', 1 GO EXEC master.dbo.sp_MSset_oledb_prop N'Microsoft.ACE.OLEDB.15.0', N'DynamicParameters', 1 GO
EXEC master.dbo.sp_MSset_oledb_prop N'Microsoft.ACE.OLEDB.15.0', N'AllowInProcess', 1 GO EXEC master.dbo.sp_MSset_oledb_prop N'Microsoft.ACE.OLEDB.15.0', N'DynamicParameters', 1 GO
- Restart entire machine
- Now this code should work
Tuesday, April 14, 2020
Dynamics NAV BC - Columbus Foods Navigation Custom Screens
- Warehouse ADC Receiving
- Order Receiving
- Inventory
- Bin Status
- Change Bin location of container
- ADC Container Move (no backoffice menu)
- ADC Bin to Bin (no backoffice menu)
- Containers - Change Bin Code manually
- BOM totals with all sublevels
- Quantity Explosion of Formula
- Quantity Explosion of BOM
- How to get ADC setup info
- User Screen - ADC User account
- User Screen - Web Service Access
- Servername - Server Machine Name
- Port - BC Instance Port
- Servicename - BC Instance Name
- Company - Refresh and Select company
Monday, April 6, 2020
Wednesday, April 1, 2020
Dynamics NAV/BC Columbus Foods - Production Planning Process
Before doing any planning
Regular Production
- Ensure item replenishment areas are setup for all manufactured items
- Ensure items with pre-processes are setup to auto-plan if component
Regular Production
- Create Formula BOMs
- Create Packaging BOMs
- Quick Planner - Run for FG (or per level of package BOM)
- Run Quick Planner again if second level is also a package bom
- Batch Planner - Run at end to generate batch planned Production Orders with batch numbering and formula int
- If an item does not show up in the batch planning list,
- the production grouping item has not been set for that family of bom items
- Go to the item card and define the production grouping item for all items in the chain
- Filter by Quantity Required > 0
- If you get "attempted to divide by zero"
- It means the intermediate below this item's item type is not set to "Intermediate" on the item card
- Either your intermediate item should be set as an intermediate
- OR Run quick planner to generate orders for this level of production
- Select Item>Plan
- If you get another "attempted to divide by zero" when packing out
- The package bom should not have multiple equipment
- Generate Pre-Process Activities
- Run Prod. Repl. Move List for each replenishment area
- If bin is marked to break containers, ADC will not be able to transfer containers into the bin
- ADC Bin to Bin raw materials to Preprocess Bins, no destination containers
- After time passes,
- Update pre-process > Register pre-process to move stock into Replenishment Bin
- ADC Bin to Bin raw materials to Replenishment Bins, no destination containers
- Execute Production
- Post Batch Reporting
- Final packout (Bread only, or second level packout of FG)
- Release Planned Production Order
- Line>Component>Production Journal
- Enter consumption and output
- Post production journal
- ADC Bin to Bin finished goods to final destination
Co-Buy Production
- Setup Std cost by products
- Setup regular primary products
- Create co-Buy Bom
- Run Supply Driven Planning